Translations:Die BSH in Polen/7/en

Aus BSH Wiki
Version vom 24. Juli 2023, 14:25 Uhr von Matthias.georgi (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „Between 1996 and 1998, BSH invested 30 million deutschmarks in the construction of the assembly plant for front-loader washing machines in Łódź, thus creating 140 new jobs.<ref>BSH Group Archive, A05-0019, inform 1996/4, page 28.</ref> A logistics center was also added to the plant, with a dishwasher plant following in 2002. This was followed in 2005 by a plant for washer-dryers, which was also located in Łódź and created 500 new jobs.<ref>BSH Group…“)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)
Zur Navigation springen Zur Suche springen

Between 1996 and 1998, BSH invested 30 million deutschmarks in the construction of the assembly plant for front-loader washing machines in Łódź, thus creating 140 new jobs.[1] A logistics center was also added to the plant, with a dishwasher plant following in 2002. This was followed in 2005 by a plant for washer-dryers, which was also located in Łódź and created 500 new jobs.[2] The new development center for dryers and the Regional Contact Center (RCC) were opened in Łódź in 2007. The RCC was part of a worldwide IT concept and was responsible for receiving and handling IT queries from around 20,000 users from five European sites, including Germany.[3]

  1. BSH Group Archive, A05-0019, inform 1996/4, page 28.
  2. BSH Group Archive, A05-0027, inform 2004/3, page 4.
  3. BSH Group Archive, A05-0030, inform 2007/2, page 7.