Translations:Der Standort Berlin/4/en

Aus BSH Wiki
Zur Navigation springen Zur Suche springen

After the fall of the Berlin wall, the general conditions at the Berlin production site changed significantly. Production in Berlin was ultimately no longer economically viable and was discontinued in 2012. At the same time, as of 2011, Berlin changed from a production to a development location. The production of high-quality washing machines continued just 40 kilometers away, at the Nauen plant opened in 1994.